Zambia Mining Contractor — Rough Terrain Forklifts
Challenge: Mining site with rough terrain, long service hours and remote location.
Solution: 4 units rough terrain forklifts + matching solid tires + spare parts in one 40HQ.
Result: Delivered in 38 days; repeat order placed after 6 months.
Middle East Warehouse Dealer — Lithium Forklift Fleet
Challenge: Indoor warehouse operation, long shift hours, need for low-noise and low-maintenance machines.
Solution: 6 units 3.5t lithium-electric forklifts + battery chargers + first-year spare parts package.
Result: Shipped in 32 days; dealer added 2 more units in the second quarter.
Southeast Asia Rental Company — Solid Tire Bulk Order
Challenge: Rental fleet with high tire wear on mixed surfaces, need for consistent batch supply.
Solution: 120 units pneumatic + solid tires across common sizes, packed in one 40HQ container.
Result: First container sold out in 8 weeks; standing monthly order established.